PROJECT NAME : Siri Subsea Cable Project LOCATION : Middle East
BUSINESS AREA : Subsea & Offshore Technology DURATION : 6-Months
CATEGORY : Control Systems & Umbilicals OPERATOR : IOOC
CONTRACTOR : SADAF
PROJECT DESCTIPTION:
Detail Design Engineering for Sirri Island “C” & “D” Oil Field Development – Subsea Cable Between Sirri
Island Poer Palnt and Nasar Platform Project. This project consists of installation of subsea and
terrestrial power and fibre optic cables between Sirri Island power plant and NASR platform.
This project in one of the on going project in SLT Sdn Bhd at this moment.
SCOPE OF WORK:
The Contractor will perform the completion of all detail design
engineering including survey, procurement, transportation,
construction/fabrication, installation, mechanical and electrical
completion, tie- ins/terminations, testing and pre-commissioning
and commissioning activities for the WORK as detailed in scope of
work .
• Detail Engineering:
1. Engineering of Submarine Cable
2. Engineering of Onshore Cabling
• Construction and Cable Laying
• Testing and commissioning